List of Works Carried in Oil & Gas, Petro-Chemical, Fertilizer, Nuclear Power & Energy Sector From 1974 to Ownwards
Year ReferenceClientNature of ServiceDescription
2022S.O # 8600001214Pak-Arab Pipeline Company LimitedCalibration of Laboratory
& Dipping Equipment
Calibration of Laboratory and Dipping Equiments at WOTS-1
2022HO/MGA/018/2021Sui Northern Gas Pipelines Limited100% Inspection of PE Fittings100% Inspection of P.E Fittings at Volta Dies, Lahore
2022HO/MGA/019/2021Sui Northern Gas Pipelines Limited100% Inspection of PE Fittings100% Inspection of P.E Fittings at IIL, Lahore
2022I.O # HOP/UCH/019/2021 Sui Northern Gas Pipelines Limited100% Inspection of Steel Line Pipe100% Inspection of Steel Linepipe at BBJ Pipe Industries Limited
2021I.O # HOP/UCH/009/2021 Sui Northern Gas Pipelines Limited100% Inspection of Steel Line Pipe100% Inspection of Steel Linepipe at Crescent Steel Allied 
2021I.O # HO/MGA/020/2021 Sui Northern Gas Pipelines Limited100% Inspection of PE Fittings100% Inspection of P.E Fittings at Mechfit Industries Lahore
2021I.O # HO/MGA/033/2021 Sui Northern Gas Pipelines Limited100% Inspection of PE Fittings100% Inspection of P.E Fittings at Mechfit Industries Lahore
2021I.O # HO/MGA/021/2021 Sui Northern Gas Pipelines Limited100% Inspection of PE Fittings100% Inspection of P.E Fittings at Mechfit Industries Lahore
2020S.O # 4700007860Pak-Arab Refinery LimitedUltrasonic TestingVisual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia KMK & MFM pipeline (Punjab Region)
2020S.O # 86000007333Pak-Arab Refinery LimitedUltrasonic TestingVisual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia KMK & MFM pipeline (Punjab Region)
2020S.O # 8600000760Pak-Arab Pipeline Company LimitedUltrasonic TestingVisual Inspection & NDT of Sleeve Weld Joints on PAPCO’s
26” dia pipeline (Punjab Region)
2020S.O # 8600000715Pak-Arab Pipeline Company LimitedUltrasonic TestingVisual Inspection & NDT of Sleeve Weld Joints on PAPCO’s
26” dia pipeline (Sindh Region)
2020I.O HO/MGA/050/2020
Date:29-10-2020
Sui Northern Gas Pipelines Limited100% Mill Inspection of Steel Line Pipes100% Inspection of Steel Line pipe size
1) 3/4″ x 0.113″ WT Qty. 700,000 (Mtr.)
2) 1″ x 0.133″ WT Qty. 850,000 (Mtr.)
3) 2″ x 0.154″ WT Qty. 450,000 (Mtr.)
2020I.O HO/MGA/043/2020
Date:25-09-2020
Sui Northern Gas Pipelines Limited100% Mill Inspection of Steel Line Pipes100% Inspection of Steel Line pipe size 2″ dia x 0.154 WT
Qty. 168,000 (Mtr.) or 910.56 (M.Ton)
2020I.O HO/MGA/042/2020
Date:25-09-2020
Sui Northern Gas Pipelines Limited100% Mill Inspection of Steel Line Pipes100% Inspection of Steel Line pipe size 1″ dia x 0.133 WT
Qty. 368,000 (Mtr.) or 927.36 (M.Ton)
2020S.O # 4700007131Pak-Arab Refinery LimitedThird Party HSEQ
& Housekeeping Audit
Third Party HSEQ & Housekeeping Audit at Stations & Terminals
2020 Haji Syed Ameer & BrothersHoliday Detection ServicesServices of Holiday Detection on laying of RCC Pipe & other Allied
Works along Lyari River from Saba Cinema to Surjani (KW&SB) S-III
Project.
2020S.O # 4700006968Pak-Arab Refinery LimitedUltrasonic TestingVisual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia KMK and 20” dia MFM pipeline.
2020S.O # 4700006853 Pak-Arab Refinery LimitedUltrasonic TestingVisual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia KMK and 16” dia MFM pipeline
2019MAJB/WICL/NDT/LG/04/2019Mir Ahmed Jan BangulzaiNDT ServicesProvided qualified UT Inspection Engineers, UT Technician, Digital UFD for weld scanning 
2019SO # 4110028663 dated 20-08-2020Pakistan State Oil Company Limited, Karachi.Pre-Shipment Inspection Third Party Pre-Shipment Inspection of Loading Arms (21 Nos.)
at Italy.
2019FI/WICL/TPI/UAE/002/2019FASIN International Pre-Shipment Inspection Third Party Pre-Shipment Inspection of Fire Fighting Equipment and related pumps
2019FI/WICL/TPI/UAE/001/2019FASIN International Pre-Shipment Inspection Third Party Pre-Shipment Inspection of Fire Fighting Equipment and related pumps
2019SO # 4110027269 dated 21-05-2019Pakistan State Oil Company Limited, Karachi.Pre-Shipment Inspection Third Party Pre-Shipment Inspection of 627 Nos. (Approx 1456 Sq.M) of sheets of Aluminium Composite Material to be imported from China.
2019SO # 4110027597 dated 16-08-2019Pakistan State Oil Company Limited, Karachi.Pre-Shipment Inspection Third Party Pre-Shipment Inspection of Cast Steel Valves in different sizes. 
2019SO # 4110027597 dated 16-08-2019Pakistan State Oil Company Limited, Karachi.Pre-Shipment Inspection Third Party Pre-Shipment Inspection of Cast Steel Valves in different sizes. 
2019SO # 4110027597 dated 16-08-2019Pakistan State Oil Company Limited, Karachi.Pre-Shipment Inspection Third Party Pre-Shipment Inspection of CS Valves in different sizes. 
2019SO # 4110026283 dated 04-10-2018Pakistan State Oil Company Limited, Karachi.Pre-Shipment Inspection Third Party Pre-Shipment Inspection of differenet
types of Valves to be imported from China
2019SO # 4110026283 dated 04-10-2018Pakistan State Oil Company Limited, Karachi.Pre-Shipment Inspection Third Party Pre-Shipment Inspection of differenet
types of Valves to be imported from China
2019S.O # 4700005505Pak-Arab Refinery LimitedUltrasonic TestingVisual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia KMK 18” dia and 16” dia MFM pipeline
(Through Ultrasonic Tool)
2019S.O # 4110026458Pakistan State Oil Company LimitedWelding Inspection
 &
 Raidography Services
NDT and Visual Inspection Services for construction projects in Karachi.
S.O # 4110026458 Dt: 28-11-2018
2019SSGC/SC/TE-8217/Cont-3335/2019Sui Southern Gas Company LimitedWelding Inspection
 &
 Raidography Services
Welding Inspection & Radiography Services for up-gradation of SMS Dhabeji
Filtering, Scrubbing & Regulation.
2019SSGC/SC/TE-8218/Cont-3187/2017Sui Southern Gas Company LimitedWelding Inspection
 &
 Raidography Services
Welding Inspection & Radiography Services at SMS Bolari for Gas Supply to PAF Bolari Air Base MVA Baran.
2019GM(QA) – 1.333.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Raidography Services
Welding Inspection & Radiography Services Contract for
16” Dia x 23 KMs Sales Gas Line from Gas Processing
Facility at Mari Petroleum Company Limited and 12” dia x 3 KMs
& 14” x 1.5 KMs Feeder Gas Line from Mari Petroleum Company
Limited Manifold to Gas Processing Facility.
2018GM(QA) – 1.331.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Raidography Services
Welding Inspection & Radiography Services Contract for 24” Dia x 93 KMs Punjab Power Plant Jhang Tr. Line.
2018SO # 4110026339 dated 24-10-2018Pakistan State Oil Company Limited, Karachi.Pre-Shipment Inspection Third Party Pre-Shipment Inspection of Tank Truck Loading Arms of 09 Nos. to be imported from Netherlands.
2018SO # 4110026339 dated 24-10-2018Pakistan State Oil Company Limited, Karachi.Pre-Shipment Inspection Third Party Pre-Shipment Inspection of Tank Truck Loading Arms of 06 Nos. to be imported from Spain.
2018SO # 4110026248 dated 24-09-2018Pakistan State Oil Company Limited, Karachi.Pre-Shipment Inspection Third Party Pre-Shipment of LED Canopy Light
of 6,500 Nos. 
2018SO # 4110016818 dated 28-10-2018Pakistan State Oil Company Limited, Karachi.Pre-Shipment Inspection Third Party Pre-Shipment Inspection of Aluminium Composite Material to be imported from China.
2018P.O # 4110026458Pakistan State Oil Company LimitedNDT & Visual InspectionNDT & Visual Inspection Services for construction projects in Karachi
2018SSGC/SC/8680Sui Southern Gas Company Limited100% Mill Inspection of Steel Line PipesMill Inspection Services for Bare Linepipes (40,000 Meters)
during manufacturing and during application of 3 LPE Coating
on Steel Line Pipes (40,000 Meters) at M/s. Liaoyang Petroleum Steel Pipe Manufactring Co. Ltd., P.R. China,
for 30”x 0.562”/ 0.469” WT Bare & 3LPE Coating Linepipes. 
2018SSGC/SC/8680Sui Southern Gas Company Limited100% Mill Inspection of Steel Line PipesMill Inspection Services for Bare Linepipes (17,000 Meters) during manufacturing and during application of 3 LPE Coating on Steel Line Pipes
(16,000 Meters) at M/s. Liaoyang Petroleum Steel Pipe
Manufactring Co. Ltd., P.R. China, for 30”x 0.562”/ 0.469”
WT Bare & 3LPE Coating Linepipes. 
2018SSGC/SC/8680Sui Southern Gas Company Limited100% Mill Inspection of Steel Line PipesPost Qualification of manufacturing facilities M/s. Liaoyang
Petroleum Steel Pipe manufacturing Co. Ltd., P.R. China,
as per API 5L through API Certified Inspector
2018I.O HO/MOP/027/15
Date:15-10-2015
Sui Northern Gas Pipelines Limited100% Mill Inspection of Steel Line Pipes100% Inspection of Steel Line pipe size 24″ & 36″ Dia
1) 24″ x 0.375″ WT (Coated) Qty. 38,690 (Mtr.)
2) 24″ x 0.438″ WT (Coated) Qty. 11,490 (Mtr.)
3) 36″ x 0.562″ WT (Bare) Qty. 113,797 (Mtr.)
4) 36″ x 0.688″ WT (Bare) Qty. 152,097 (Mtr.)
2018SO # 4700005851Pak-Arab Refinery LimitedUltrasonic TestingVisual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia  KMK and 20” dia Transfer line  (Through Ultrasonic Tool)
2018SO # 4700005792Pak-Arab Refinery LimitedUltrasonic TestingVisual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia  KMK and 18” dia MFM pipeline  (Through Ultrasonic Tool)
2018SO # 8600000355 Pak-Arab Pipeline Company LimitedUltrasonic TestingVisual Inspection & NDT of Sleeve Weld Joints on
PAPCO’s 26” dia Pipeline (Through Ultrasonic Tool)
2018P.O # 001/2018/LPGTOTAL Parco Marketing Ltd.C.P AuditInspection of underground 100×2 metric ton LPG bullets/storage tanks for cathodic protection system assessment/testing
2017SO # 8600000342Pak-Arab Pipeline Company LimitedUltrasonic TestingVisual Inspection & NDT of Sleeve Weld Joints on
PAPCO’s 26” dia Pipeline (Through Ultrasonic Tool)
2017SSGC/SC/6502-rev-1Sui Southern Gas Company Limited100% Mill Inspection of Steel Line PipesCarrying out the Technical Evaluation (Post Qualification)
of Manufacturing Facilities of Qingdao Dacang Anticorrision
Co. Ltd., China.
2017S.O # 4500077557 , SV-10104752Pakistan Petroleum Limited100% Mill Inspection of Steel Line PipesThird Party Inspection of Line Pipes 6” X  10.97mm API 5L
BR with 3LPE Coating Qty.29 KM in Anhui Tianda Oil Pipe
Co. Ltd., Chuzhou City, China on behalf of Pakistan Petroleum
Limited.
2017SSGC/SC/7547Sui Southern Gas Company Limited100% Mill Inspection of Steel Line PipesMill Inspection Services & Loading Supervision for
42”x 0.562” WT  API 5L Grade X70 (PSL-2) 19,700 Meters
Bare Linepipe at M/s. North China Petroleum Steel Pipe
Co. Ltd., P.R. China & 3LPE Coating at M/s. Crescent Steel
& Allied Product Nooriabad
2017I.O HO/MGA/036/16
Date:23-06-2016
Sui Northern Gas Pipelines Limited100% Mill Inspection of Steel Line Pipes100% Inspection of Steel Line pipe size 3/4″ Dia  Qty. 200,000 (Mtr.)
2017I.O HOP/M/021/15
Date:22-06-2015
Sui Northern Gas Pipelines Limited100% Mill Inspection of Steel Line Pipes100% Inspection of Steel Line pipe size 1″, 2″ & 4″ Dia
1) 42″ x 0.562″ WT  Qty. 41,410 (Mtr.)
2) 42″ x 0625″ WT  Qty. 24,543 (Mtr.)
2017I.O HO/MGA/053/15
Date:01-10-2015
Sui Northern Gas Pipelines Limited100% Mill Inspection of Steel Line Pipes100% Inspection of Steel Line pipe size 1″, 2″ & 4″ Dia
1) 1″ x 0.133″ WT  Qty. 635,000 (Mtr.)
2) 2″ x 0154″ WT  Qty. 320,000 (Mtr.)
3) 4″ x 0.188″ WT Qty. 260,000 (Mtr.)
2017 Pak-Arab Refinery LimitedC.P AuditAnnual Cathodic Protection Inspection of CP System installed for protection of LPG Tanks at Port Qasim Filling Plant
2017SO # 4700004829Pak-Arab Refinery LimitedUltrasonic Testing ServicesVisual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia  KMK and 18” dia & 16″ dia MFM pipeline in Punjab from Kashmore to Sheikhupura (Through Ultrasonic Tool)
SO # 4700004829 DT: 09-01-2017
2017SO # 4700005184Pak-Arab Refinery LimitedUltrasonic Testing ServicesVisual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia  KMK and 18” dia & 16″ dia MFM pipeline in Punjab
(Through Ultrasonic Tool)
SO # 4700005184 DT: 11-07-2017
2017SO # 4700005213Pak-Arab Refinery LimitedUltrasonic Testing ServicesVisual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia  KMK and 20” dia Transfer line  (Through Ultrasonic Tool)
SO # 4700005213 DT: 27-07-2017
2017SO # 8600000235Pak-Arab Pipeline Company LimitedUltrasonic TestingVisual Inspection & NDT of Sleeve Weld Joints on
PAPCO’s 26” dia Pipeline (Through Ultrasonic Tool)
SO # 8600000235 Dt: 31-07-2017
2017GM(QA)-1.320.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Raidography Services
Welding Inspection & Radiography Services Contract for
 ¾” to 2” Dia and above Assorted Operational Phases in
Sahiwal Distribution Region.
 GM(QA)-1.320.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Raidography Services
Welding Inspection & Radiography Services Contract for
 ¾” to 2” Dia and above Assorted Operational Phases in
Sheikhupura Distribution Region.
2016S.O # 4110021982Pakistan State Oil Company LimitedNDT Insepction ServicesNDT Inspection Services during Rehabilitation of  Tank T-09 at ZOT Karachi (Dia: 62.5 M , Height: 15M)
2016S.O # 4110021981Pakistan State Oil Company LimitedNDT Insepction ServicesNDT Inspection Services during Rehabilitation of Vertical MoGas Storgae Tank # 312 at Keamari Terminal-B, (Dia: 24.4 M , Height: 14.6M)
2016 BST ServicesRaidographic TestingVisual Welding Inspection & Radiograpic Testing of different diameter of pipelines at Tandoadam
2016SO # 8600000044Pak-Arab Pipeline Company LimitedInspection of TankExternal Inspection of Slop Tank T-2501 at WOPS-2, Bubak
2016SO # 8600000055Pak-Arab Pipeline Company LimitedInspection of TankExternal Inspection of Slop Tank T-4501 at WOPS-4, Fazilpur
2016SO # 8600000108Pak-Arab Pipeline Company LimitedInspection of TankInternal Inspection of tank T-5004 at WOTS-3, Mahmoodkot
2016SO # 4700004327Pak-Arab Refinery LimitedUltrasonic Testing ServicesVisual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia  & 20″ dia pipeline from Karachi to Kashmore (Sindh Region) (Through Ultrasonic Tool)
SO # 4700004327 DT: 11-04-2016
2016SO # 8600000041Pak-Arab Pipeline Company LimitedUltrasonic Testing ServicesVisual Inspection & NDT of Sleeve Weld Joints on
PAPCO’s 26” dia Pipeline from Kashmore to Mahmood Kot (Punjab Region) (Through Ultrasonic Tool)
SO # 8600000041 Dt: 11-04-2016
2016SO # 8600000042Pak-Arab Pipeline Company LimitedUltrasonic Testing ServicesVisual Inspection & NDT of Sleeve Weld Joints on
PAPCO’s 26” dia Pipeline from Karachi to Kashmore (Sindh Region) (Through Ultrasonic Tool)
SO # 8600000042 Dt: 11-04-2016
2016SO # 4700004326Pak-Arab Refinery LimitedUltrasonic Testing ServicesVisual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia  KMK and 18” dia & 16″ dia MFM pipeline in Punjab from Kashmore to Sheikhupura (Through Ultrasonic Tool)
SO # 4700004326 DT: 11-04-2016
2016GM(QA)-1.297.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for ¾” to 2” Dia and above
Assorted Operational Phases in Multan Distribution Region.
Project Ref:GM(QA)-1.297.3
2016GM(QA)-1.296.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for ¾” to 2” Dia and above
Assorted Operational Phases in Lahore  &  Sheikhupura Distribution
Regions.
Project Ref:GM(QA)-1.296.3
2016GM(QA)-1.305.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  16””  Dia x 26 KMS BV3
(Khurrianwala) – B1 (Manawala) Transmission Line.
Project Ref:GM(QA)-1.305.3
2016GM(QA)-1.307.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  30””  Dia x 110 KMS
Sahiwal-Phoolnagar Transmission Line.
Project Ref:GM(QA)-1.307.3
2016Work Contract # 4200037253Pakistan Petroleum LimitedWelding Inspection
 &
 Radiography Services
Visual & Radiographic Inspection Services for Kandhkot Well-33 (1 KM), and GGM 16″ CS Loop Line (28 KM) at Kandhkot Gas Field, Sindh..
Call-Out Agreement # 4600000749
Work Contract # 4200037253 Dt: 08-02-2016
2016Work Contract # 4200039141Pakistan Petroleum LimitedWelding Inspection
 &
 Radiography Services
Visual & Radiographic Inspection Services at all locations of PPL througout Pakistan.
Call-Out Agreement # 4600000749
Work Contract # 4200039141 Dt: 01-08-2016
2015SO # 4700003336Pak-Arab Refinery LimitedVisual & Radiography
Inspection
NDT Services  ( Visual Inspection before and during Welding
of Butt Weld Joints of 16″ dia Pipe API 5L x 56, Wall Thickness
9.5MM and Radiography of 16″ dia pipe.
SO # 4700003336 Dt: 26-11-2014
2015SO # 3414150134Pak-Arab Pipeline Company LimitedUltrasonic Testing
Services
Visual Inspection & NDT of Sleeve Weld Joints on PAPCO’s
26″ dia pipeline (Sindh Region) with Ultrasonic Tool
SO # 3414150134 DT: 12-12-2014
2015SO # 3414150135 Pak-Arab Pipeline Company LimitedUltrasonic Testing
Services
Visual Inspection & NDT of Sleeve Weld Joints on PAPCO’s
26″ dia pipeline (Punjab Region) with Ultrasonic Tool
SO # 3414150135 DT: 12-12-2014
2015SO # 4700003395 Pak-Arab Refinery LimitedUltrasonic Testing
Services
Visual Inspection & NDT of Sleeve Weld Joints on PARCO’s
8″,16”,18″,20″ & 30″ dia pipeline (Sindh Region) with Ultrasonic Tool
SO # 4700003395 DT: 17-12-2014
2015Work Contract # 4200033423 Dt: 01-01-2015Pakistan Petroleum LimitedVisual & Radiographic
Inspection, Coating & DPT Inspection Services
Visual & Radiographic Inspection Services 6″, 8″, & 20″ for ADAM WEST X-1 Feederline.
Call-Out Agreement # 4600000749
Work Contract # 4200033423 Dt: 01-01-2015
2015Work Contract # 4200034278 Dt: 12-04-2015Pakistan Petroleum LimitedDPT Inspection ServicesNDT Services during Mazarani Sale Gas Pipeline Sleeve Installation/repairing job under live conditions at Mazarani Gas Field
Call-Out Agreement # 4600000749
Work Contract # 4200034278 Dt: 12-04-2015
2015Work Contract # 4200034330 Dt: 18-04-2015Pakistan Petroleum LimitedVisual & Radiographic
Inspection, Coating & DPT Inspection Services
Visual & Radiographic Inspection Services for Adhi Well-14 Feeder Line at Adhi Field
Call-Out Agreement # 4600000749
Work Contract # 4200034330 Dt: 18-04-2015
2015Work Contract # 4200034563 Dt: 11-05-2015Pakistan Petroleum LimitedVisual & Radiographic
Inspection Services
Visual & Radiographic Inspection Services for Adhi Well-22 Feeder Line.
Call-Out Agreement # 4600000749
Work Contract # 4200034563 Dt: 11-05-2015
2015Work Contract # 4200035928 Dt: 18-09-2015Pakistan Petroleum LimitedVisual & Radiographic
Inspection Services
Visual & Radiographic Inspection Services 
Call-Out Agreement # 4600000749
Work Contract # 4200035928 Dt: 18-09-2015
2015Work Contract # 4200035928 Dt: 18-09-2015Pakistan Petroleum LimitedVisual & Radiographic
Inspection Services
Visual & Radiographic Inspection Services on Welded Joints of 20″ dia at KFGCS during shutdown for throttle valve relacement.
Call-Out Agreement # 4600000749
Work Contract # 4200035928 Dt: 18-09-2015
2015Work Contract # 4200036098 Dt: 13-10-2015Pakistan Petroleum LimitedVisual & Radiographic
Inspection, Coating & DPT Inspection Services
Visual & Radiographic Inspection Services for Adhi Well-20 & 21 Feeder Line.
Call-Out Agreement # 4600000749
Work Contract # 4200036098 Dt: 13-10-2015
2015SO # 4700003462Pak-Arab Refinery LimitedUltrasonic Testing
Services
Visual Inspection & NDT of Sleeve Weld Joints on PARCO’s
16” dia  & 18″ dia pipeline (Punjab Region) (Through Ultrasonic Tool)
SO # 4700003462 DT: 21-01-2015
2015 Crescent
Construction
Company
Radiography, Ultrasonic
& Holiday Detection Test
Radiography, Ultrasonic and Holiday Detection Test during
the construction/fabrication of “Contract Package: WS-03,
Water Supply and Transmission Loop, Jacobabad of 24″ dia
Pipe (600mm), 7 Km length.
2015GM(QA)-1.281.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for ¾” to 2” Dia and above
Assorted Operational Phases in Lahore  &  Sheikhupura Distribution
Regions.
Project Ref:GM(QA)-1.281.3
2015GM(QA)-1.280.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for ¾” to 2” Dia and above
Assorted Operational Phases in Multan Distribution Region.
Project Ref:GM(QA)-1.280.3
2015GM(QA)-1.277.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 42” Dia x 51.96 KMs LNG Sawan-SV-2 and SV2-SV3 Transmission Lines.
Project Ref:GM(QA)-1.277.3
2014EPIC/WAJEDO/14/10122EPIC (Pvt.) Ltd.NDT ServicesWelding Supevision during Fabriacation, Erection, Installation as well as consultancy on various welding techniques, complete supervison of NDT Services i.e. Liquid Penetration Testing of material and welded ares.
2014TB/WICL/QA&QC/NDT/03/078Tahir Builders & DevelopersQA/QC ServicesQA/QC Services during laying of 18″ dia x 6.4 mm MS Pipeline at Gujranwala Cantonment
2014-2015SBK: WICL/Ltr: 12-2015Shaikh Baz Khan & BrothersRadiography, Ultrasonic,
Holiday Testing & Welding Consulting Services.
Radiography Testing, Ultrasonic Testing, Holiday Testing &
Welding Consulting Services on 24″ dia MS Pipeline 24KM
under Contract Package WS-02 (High Lift Pumping System &
Rising Mains) Jacobabad (MSDP) – USAID Funded Project.
2014W.A No.  N-232/13-14Pakistan Oilfields LimitedRadiography, Coating,
DPT 
NDT Services (Radiography, Coating, DPT) on replacement of 4″ dia Turkwal H-1, Production Pipeline (1000 RFT)
W.A No.  N-232/13-14/S Dt:22-01-2014
2014Order No.7100014031MARI
Petroleum Co. Ltd.
Radiography, Coating,
Holiday Testing Services
NDT Services (Radiography, Coating, DPT) during Mechanical
Fabrication Works at Zarghun.
PR No.1010013079 Order No.7100014031/1 Dt:11-04-12014
2014SO # 4800001078Pak-Arab Refinery LimitedCalibration of HSD TankServices for Calibration of HSD Tank 945-TK26 at PARCO-MCR, MKT.
2014-2015SO # 4700003050Pak-Arab Refinery LimitedVisual & Radiography
Inspection
NDT Services  ( Visual Inspection before and during Welding
of Butt Weld Joints of 16″ dia Pipe API 5L x 56, Wall Thickness
9.5MM and Radiography of 16″ dia pipe.
SO # 4700003050 Dt: 23-05-2014
2014GM(QA)-1.273.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for ¾” to 2” Dia and above
Assorted Operational Phases in Bahawalpur Distribution Region.
Project Ref:GM(QA)-1.273.3
2014GM(QA)-1.272.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for ¾” to 2” Dia and above
Assorted Operational Phases in Sahiwal Distribution Region.
Project Ref:GM(QA)-1.272.3
2014GM(QA)-1.270.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for ¾” to 2” Dia and above
Assorted Operational Phases in Lahore & Sheikhupura Distribution Regions.
Project Ref:GM(QA)-1.270.3
2014GM(QA)-1.269.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for ¾” to 2” Dia and above
Assorted Operational Phases in Multan Distribution Region.
Project Ref:GM(QA)-1.269.3
2013 Samra EnterprisesNDT ServicesProvided Welding Engineers, DPT Services at Seismic Upgrade Works at the Canadian High Commission Islamabad.
2013SE/WIC/TPI/614/13Sun EngineersThird Party QA/QC & NDT InspectionThird Party QA/QC including NDT Services on construction of 16″ dia MS Pipeline 21.9 KMS Dargai (KPK)
2013-2014 Pak-Arab Refinery LimitedUltrasonic TestingNDT of all sleeve weld joints with calibrated ultrasonic tool
Visual Inspection, Procedure Qualification Test & Welders Qualification Test by Visual, non-destructive and Radiographic Test as per API-1107/1104
2013-2014 Pak-Arab Pipeline Company LimitedUltrasonic TestingNDT of all sleeve weld joints with calibrated ultrasonic tool
Visual Inspection, Welders Qualification Test by Visual,
non-destructive and Radiographic Test as per API-1107/1104
2013-2014W.A No. N-40/13-14Pakistan Oilfields Limited Radiography & Hardness Testing & Inspection ServicesServices of Radiography, Hardness Testing and Inspection
Services on laying 10″ dia KCDF Crude Oil Pipeline Ahmedal-Dhurnal & Pindfatah-Ranyal Sections (36 KM) at Khaur – ARL Pipeline.
W.A No. N-40/13-14 Dt: 12-08-2013
2013-2014W.A No. N-107/13-14Pakistan Oilfields Limited Radiography & Hardness Testing & Inspection ServicesServices of Radiography, Hardness Testing and Inspection
Services on replacement of 6″ dia weak section of Balkassar-
Khaur Oil Pipeline at Khaur Village (2.5 KM)
W.A No. N-107/13-14 Dt: 22-10-2013
2013-2014GM(QA)-1.259.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  2” Dia and above
Assorted Operational Phases in Lahore, Sahiwal & Sheikhupura Distribution Regions.
Project Ref:GM(QA)-1.259.3
2013-2014GM(QA)-1.260.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  2” Dia and above
Assorted Operational Phases in Multan & Bahawalpur Distribution Regions.
Project Ref:GM(QA)-1.260.3
2013Contract No.GMH/JRP/01NESPAKRadiographic
&
Ultrasonic Testing 
Radiographic/Ultrasonic Testing & Interpretation of the results
of the joints for the project 22MW Jabban Heps Rehabilitation
Project Contract No.GMH/JRP/01
2012-2013 Pak-Arab Refinery LimitedWelding Inspection
 &
 Radiography Services
NDT Services  at Unarwah, Begari, Shahi & Patfeeder (Horizontal Directional Drilling Projects) of 16″ dia Grade API 5L x 46, 0.500″ Wall Thickness Butt Weld Joints.
SO # 4700002115 Dt: 29-08-2012
2012-2013GM(QA)-1.249.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  2” Dia and above
Assorted Operational Phases in Lahore, Sahiwal & Sheikhupura Distribution Regions.
Project Ref:GM(QA)-1.249.3
2012-2013GM(QA)-1.253.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 2” Dia and above
Assorted Operational Phases in Islamabad & Abbottabad Distribution Regions.
Project Ref:GM(QA)-1.253.3
2012-2013GM(QA)-1.254.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 2” Dia and above
Assorted Operational Phases in Gujranwala Distribution Region.
Project Ref:GM(QA)-1.254.3
2011-2013TDJ/WAJEDO/LT/09-13/001M/s. Consortium
of Tobishima Corporation
& DAI Nippon Construction
NDT Services
(Ultrasonic Flaw Detection
 & Dye-Penetrant Testing)
NDT Services (Ultrasonic Flaw Detection & Dye-Penetrant Testing) in the project for improvement of Water Supply System in Abbottabad.
2011GM(QA)-1.237.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  2” Dia & above ssorted operational phases in Lahore Distribution Region.
Project Ref:GM(QA)-1.237.3
2011GM(QA)-1.238.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  2” Dia & above ssorted operational phases in Gujranwala Distribution Region.
Project Ref:GM(QA)-1.238.3
2011GM(QA)-1.239.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  2” Dia & above ssorted operational phases in Multan & Bahawalpur Distribution Region.
Project Ref:GM(QA)-1.239.3
2011RMG/WAJEDO/12/3278RM Gulistan
Engineers
& Contractors
NDT ServicesNDT Services on various projects in Islamabad & Karachi on behalf of M/s. Capital Development Authority (Islamabad) & M/s. Karachi Water & Sewerage Board (Karachi) Layed 18″ , 16″ , 12″ , & 10″ dias pipes 11 KM
2011RMG/WAJEDO/12/3277RM Gulistan
Engineers
& Contractors
NDT ServicesNDT Services on various projects in Islamabad & Karachi on behalf of M/s. Capital Development Authority (Islamabad) & M/s. Karachi Water & Sewerage Board (Karachi) Layed 48″ , 30″ , 24″ , & 18″ dias pipes 27 KM
2011ASC/CDA/WICL/01/12Abdul Sattar
& Co.
QA/QC ServicesQA/QC Services during laying of 18″ dia x 7.8mm MS Pipeline from Adiyala Jail to Coopretive Housing Soceity Rawalpindi
2011 Abdul Sattar
& Co.
Radiography, Ultrasonic
& Holiday Detection Test
Radiographic/Ultrasonic and Holiday Test on MS Water Supply Pipes of 18″, 12″, 10″, 08″ dia 
2011MC-011/105-09-2011Matracon
Pakistan
(Pvt) Ltd.
NDT ( RT, UT, DPT, Coat & Wrap, Civil Works ) QA/QC NDT ( RT, UT, DPT, Coat & Wrap, Civil Works ) QA/QC as Third Party Services on 36″ dia MS 7.8 KMs 7 MGD Raw Water Pipeline Project of M/s. Fauji Fertilizer Port Bin Qasim Karachi,
Pakistan.
2011PO # 3411120061  Dt:27-09-2011Pak-Arab Pipeline Company LimitedUltrasonic TestingInspection of Full Encirlement Sleeve Welding on PAPCO’s 26″ Dia Pipelines with Ultrasonic Tools
PO # 3411120061  Dt:27-09-2011
2011PO # 4700001553  Dt:15-09-2011Pak-Arab Refinery LimitedUltrasonic TestingInspection of Full Encirlement Sleeve Welding on PARCO KMK/MFM Pipelines with Ultrasonic Tools
PO # 4700001553  Dt:15-09-2011
2011PO # 1010003002 Dt: 16-05-2011MARI
Gas Co. Ltd.
Welding Inspection
 &
 Radiography Services
Radiographic Testing for 4″ Line from Well 3 23 to GT Station at MGCL Colony, Daharki (6.5 KM)
PO # 1010003002 Dt: 16-05-2011
2011SO # SCL/Bazai/2010 Dt: 15-07-2010Sarwar & Co.
(Pvt.) Ltd.
Welding Inspection
 &
 Radiography Services
Radiography Testing on construction of water pipe line project by M/s. Bazzai Irregation scheme in District Mardan/Malakand (KPK) for MS pipe 6mm thickness dia from 1.2 m to 1.5 m internal 10 Km length
2011SO # AHC/WICL/BISM/12/04 Al-Hadeed
Constructors
Welding Inspection
 &
 Radiography Services
Radiography Testing on construction of water pipe line project by M/s. Bazzai Irregation scheme Mardan at (KPK) for MS pipe 6mm thickness dia from 1.2 m to 1.5 m internal 10 Km length
2011GM(QA)-1.245.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  12” Dia x 25 KMs Shah Wali Rojhan Line.
Project Ref:GM(QA)-1.245.3
2011GM(QA)-1.242.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  2” Dia & above ssorted operational phases in Faisalabad Distribution Region.
Project Ref:GM(QA)-1.242.3
2011GM(QA)-1.241.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  2” Dia & above ssorted operational phases in Islamabad & Abbottabad Distribution Region.
Project Ref:GM(QA)-1.241.3
2011GM(QA)-1.240.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  2” Dia & above ssorted operational phases in Peshawar Distribution Region.
Project Ref:GM(QA)-1.240.3
2010SBK: WICL/M.P/2010/2197Shaikh Baz Khan & BrothersRadiography, Ultrasonic,
Holiday Testing & Welding Consulting Services.
Radiography Testing, Ultrasonic Testing, Holiday Testing &
Welding Consulting Services on (KW&SB) Project Contract Pakage No.1 (WSS-1) replacement of balance project (3.6 KM) of old Dhabeji PRCC
2010SBK: WICL/M.P/2010/2196Shaikh Baz Khan & BrothersRadiography, Ultrasonic,
Holiday Testing & Welding Consulting Services.
Radiography Testing, Ultrasonic Testing, Holiday Testing &
Welding Consulting Services on (KW&SB) construction of proposed M.S Rising of 66″ dia (DN 1676MM) from Hub Pumping Station to Hub Treatment Works.
2010 Oil & Gas Development Co. Ltd.Welding Inspection
 &
 Radiography Services
Welding Inspection & Radiography on 8″ dia , 06 Kms Nashpa Well to Nashpa CPF (1st Segment), Neshpa CPF to Injection Point on 12″ Dia Line (Second Segment) and four nos. valve assemblies.
2010Order No. MGILP-514/2009-2010 MARI
Gas Co. Ltd.
Welding Inspection
 &
 Radiography Services
Welding Inspection & Radiography Services Contract for  6” Dia Pipeline form Well # 85 -79 at MGCL Daharki.
PR No. MGDL-134/2009-2010
Order No. MGILP-514/2009-2010 Dt: 28-06-2010
2010Order No. MGILP-445/2009-2010MARI
Gas Co. Ltd.
Welding Inspection
 &
 Radiography Services
Welding Inspection & Radiography Services Contract for  8” Dia Pipeline Welding & Fabrication at MGCL Field Daharki.
PR No. MGDL-231/2009-2010
Order No. MGILP-445/2009-2010 Dt: 10-05-2010
2010Order No. MGBLP-62/2009-2010 MARI
Gas Co. Ltd.
Welding Inspection
 &
 Radiography Services
Welding Inspection & Radiography Services Contract for  6” Dia Pipeline Welding & Fabrication at MGCL Field Daharki.
PR No. MGBL-93/2009-2010
Order No. MGBLP-62/2009-2010 Dt: 29-04-2010
2010GM(QA)-1.235.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  8” Dia x 27.61 KMs Kalarwali-Alipur Line.
Project Ref:GM(QA)-1.235.3
2010GM(QA)-1.233.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  12” Dia x 19.705 KMs Flow Line From Maram Zai to Mammi Khel-1.
Project Ref:GM(QA)-1.233.3
2010GM(QA)-1.232.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  8” Dia x 31.60 KMs MID V/A (THANA) ON SWAT LINE TO TALASH.
Project Ref:GM(QA)-1.232.3
2010GM(QA)-1.228.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  3” Dia x 5.60 KMs M3- WHSF-FLOW LINE FOR MOL ii) 8″ x 6.5 KMs NESHPA LINE FOR OGDCL iii) 3,2,1 & 3.4″ dia , 300 WID MANSALI 3 – WHSF MOL.
Project Ref:GM(QA)-1.228.3
2010GM(QA)-1.227.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  6” Dia & above ssorted operational phases in Peshawar Distribution Region.
Project Ref:GM(QA)-1.227.3
2010GM(QA)-1.226.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  6” Dia & above ssorted operational phases in Lahore Distribution Region.
Project Ref:GM(QA)-1.226.3
2010GM(QA)-1.225.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  6” Dia & above ssorted operational phases in Multan & Bahawalpur Distribution Region.
Project Ref:GM(QA)-1.225.3
2010GM(QA)-1.224.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  6” Dia & above ssorted operational phases in Gujranwala Distribution Region.
Project Ref:GM(QA)-1.224.3
2010GM(QA)-1.222.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  6” Dia & above ssorted operational phases in Faisalabad Distribution Region.
Project Ref:GM(QA)-1.222.3
2010GM(QA)-1.216.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 8” Dia x 30 KMs Khangarh Via Alipur to Wasandewali & Aludewali-NA-179
Project Ref:GM(QA)-1.216.3
2009P.O # 745689Engro Polymer & Chemical LimitedHoliday Detection ServicesServices for Holiday Detection 
2009P.O # 745346Engro Polymer & Chemical LimitedHoliday Detection ServicesServices for Holiday Detection on HS-106, MS-107, MS-109 Pressure Vessels
2009P.O # 744636Engro Polymer & Chemical LimitedHoliday Detection ServicesServices for Holiday Detection 
2009GM(QA)-1.213.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 8” Dia x 21 KMs Muridwala Tr. Line-Faisalabad.
Project Ref:GM(QA)-1.213.3
2009GM(QA)-1.212.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 12” Dia x 01 KMs Kashmore-Shahwali Transmission Line
Project Ref:GM(QA)-1.212.3
2009GM(QA)-1.207.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 6” Dia & Above assorted operational phases in Lahore Distribution Region
Project Ref:GM(QA)-1.207.3
2009GM(QA)-1.206.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 6” Dia & Above assorted operational phases in Multan & Bahawalpur Distribution Regions
Project Ref:GM(QA)-1.206.3
2009GM(QA)-1.205.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 6” Dia & Above assorted operational phases in Gujranwala Distribution Region
Project Ref:GM(QA)-1.205.3
2009GM(QA)-1.204.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 6” Dia & Above assorted operational phases in Islamabad & Abbottabad Distribution Regions
Project Ref:GM(QA)-1.204.3
2009GM(QA)-1.203.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 6” Dia & Above assorted operational phases in Faisalabad Distribution Region
Project Ref:GM(QA)-1.203.3
2009GM(QA)-1.196.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 8” Dia x 9.9 KMs, 8″ x 9.40 KMs,12″ x 9.10 KMs & 18″ x 23.60 KMs Gas Gathering System of M/s. MOL Pakistan
Project Ref:GM(QA)-1.196.3
2008GM(QA)-1.202.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 16” Dia x 35.57 KMs Galijagir (C6)-Ranial Loopline Transmission Line (Project-IX)
Project Ref:GM(QA)-1.202.3
2008GM(QA)-1.201.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 20” Dia x 35.50 KMs Transmission Line for M/s. Engro Fertilizer Plant at Ghotki
Project Ref:GM(QA)-1.201.3
2008GM(QA)-1.194.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 6” Dia & Above assorted operational phases in Peshawar Distribution Region
Project Ref:GM(QA)-1.194.3
2008GM(QA)-1.193.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 6” Dia & Above assorted operational phases in Lahore Distribution Region
Project Ref:GM(QA)-1.193.3
2008GM(QA)-1.192.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 6” Dia & Above assorted operational phases in Multan & Bahawalpur Distribution Region
Project Ref:GM(QA)-1.192.3
2008GM(QA)-1.191.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 6” Dia & Above assorted operational phases in Gujranwala Distribution Region
Project Ref:GM(QA)-1.191.3
2008GM(QA)-1.189.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 6” Dia & Above assorted operational phases in Faisalabad Distribution Region
Project Ref:GM(QA)-1.189.3
2008GM(QA)-1.188.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 36” Dia x 36.86 KMs Mian Channu-Sahiwal Transmission Line
Project Ref:GM(QA)-1.188.3
2008IC/PM/KW&SB/ORP/08/S/280Indusmens
Corporation
Radiography, Ultrasonic
& Holiday Detection Test
Radiography, Ultrasonic and Holiday Detection Test during
the rehabilitation and strengthening of Water System under K-III Project  “Contract Package-7, Contract WSS-13 Rehabilitation Works of Orangi Reservoir)
2006SSGC/SC/TE-672/Cont-594/2006Sui Southern Gas Company LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection & Radiography Services on 20″ dia x 14 KM
Distribution Main from Hino Chowk Korangi to DHA Desalination Plant, Karachi.
Contract No. SSGC/SC/TE-672/Cont-594/2006
2006SSGC/SC/TE-597/Cont-544/2006Sui Southern Gas Company LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection & Radiography Services on 24″ dia x 200 KM Bajara- Karachi Pipeline.
Contract No. SSGC/SC/TE-597/Cont-544/2006
2006GM(QA)-1.162.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 16” Dia x 62 KMs Hattar-Havellian-Abbottabad Line
Project Ref:GM(QA)-1.162.3
2005GM(QA)-1.155.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for 4″, 6”, 8″ & 16″ Dia Assorted operational phases in Peshawar Distribution Region
Project Ref:GM(QA)-1.155.3
2005GM(QA)-1.154.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  6”, 8″, 10″ & 12″ Dia Assorted operational phases in Islamabad Distribution Region
Project Ref:GM(QA)-1.154.3
2005GM(QA)-1.149.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  12” Dia x 79 KMs and 16″ dia x 30 KMs Murree Line
Project Ref:GM(QA)-1.149.3
2005GM(QA)-1.145.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  10” Dia x 54 KMs Kandhkot-Guddu U/S Pipeline
Project Ref:GM(QA)-1.145.3
2005SSGC/SC/TE-462/Cont-474/2005Sui Southern Gas Company LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection & Radiography Services on 16″ dia x 15 KM Third Distribution Supply Main, Hyderabad
Contract No. SSGC/SC/TE-462/Cont-474/2005
2005 SSGC/SC/TE-530/Cont-493/2005Sui Southern Gas Company LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection & Radiography Services on 24″ dia x 15 KM From Masu Bhurgari to HQ3
Contract No. SSGC/SC/TE-530/Cont-493/2005
2005GM(QA)-1.139.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  6”, 8″, 10″ 12″ & 16″ Dia Assorted operational phases in Lahore Distribution Region
Project Ref:GM(QA)-1.139.3
2005GM(QA)-1.138.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  6” &  8″ Dia Assorted operational phases in Faisalabad  Distribution Region
Project Ref:GM(QA)-1.138.3
2005GM(QA)-1.132.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  36” Dia x 26 KMs AC4-AV15 Pipeline. Project Ref:GM(QA)-1.132.3
2005 Pak-Arab Refinery LimitedUltrasonic InspectionInspection of Full Encirclement Sleeve Welding on PARCO 16″ Dia KMK Line.
2005 Pak-Arab Refinery LimitedUltrasonic InspectionInspection of Full Encirclement Sleeve Welding on PARCO 16″ Dia KMK Line.
2004GM(QA)-1.130.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for modification and new installations at Compressor Stations
Project Ref:GM(QA)-1.130.3
2004GM(QA)-1.131.3Sui Northern Gas Pipelines LimitedWelding Inspection
 &
 Radiography Services
Welding Inspection Services Contract for  36” Dia x 26 KMs AV-29 A8 Pipeline
Project Ref:GM(QA)-1.131.3
2004W.O # Const/2004-62/ZOTPakistan State Oil Company LimitedNDT & Visual InspectionNDT and Visual Inspection during rehabilitation of storage tank at PSO Buffer Oil Terminal
2004 DCNRadiogrphic InspectionRadiography / X-Ray & Interpretation of Radiographs of Welded Joints of AGOSTA-90B SUBMARINE PNS/ M SAAD 
2004PL/04/8025Pak-Arab Refinery LimitedUltrasonic InspectionInspection of Full Encirclement Sleeve Welding on PARCO 16″ Dia KMK Line.
2004PL/04/8025Pak-Arab Refinery LimitedUltrasonic InspectionInspection of Full Encirclement Sleeve Welding on PARCO 16″ Dia KMK Line.
2004PL/04/8025Pak-Arab Refinery LimitedWelding Inspection
&
Radiography Testing
Radiographic Inspection of Butt Weld Joints at RBOD Overhead Crossing Bhan Saeedabad, Sehwan, District Dadu.
2004 SSGC/SC/TE-294/Cont-281/2004Sui Southern Gas Company LimitedWelding Inspection
&
Radiography Testing
Welding Inspection & Radiography Services on 30″ dia x 9 KM Bypass from HQ3 to SMS Sindh University
Contract No. SSGC/SC/TE-294/Cont-281/2004
2003GM(QA)-1.123.3Sui Northern Gas Pipelines LimitedWelding Inspection
&
Radiography Testing
Welding Inspection Services Contract for  6” &  16″ Dia Assorted operational phases in Faisalabad  Distribution Region
Project Ref:GM(QA)-1.123.3
2002GM(QA)-1.102.3Sui Northern Gas Pipelines LimitedWelding Inspection
&
Radiography Testing
Welding Inspection Services Contract for  6”, 8″  &  12″ Dia Assorted operational phases in Gujranwala  Distribution Region
Project Ref:GM(QA)-1.102.3
2002GM(QA)-1.97.3Sui Northern Gas Pipelines LimitedWelding Inspection
&
Radiography Testing
Welding Inspection Services Contract for  36” Dia x 16.35 Miles (Loopline) AV39-AC8 Section Project Ref:GM(QA)-1.97.3
2002 Crescent Steel & Allied
Product Ltd.
Welding Inspection
&
Radiography Testing
Radiography Examination of Spiral Welds at Pipe ends of pipes of high pressure gas pipe line at Crescent Steel & Allied Product Ltd.
2001 Pak-American Fertilizer Ltd.Radiography InspectionRadiography Works regarding Rehabilitation of Primary Reformer (A-101B) pertaining to PAFL
2001 Pak-Arab Refinery LimitedWelding Inspection
&
Radiography Testing
Inspection of Welding for replacement of Pipe Segment on
PARCO 16″ Mainline at Taunsa Barrage O/H XING
2001 Pakistan Oilfields LimitedWelding Inspection
&
Coat Wrap Inspection
Welding Inspection and Coat Wrap Inspection of 8″ dia Gas Pipeline
between Khaur and Meyal (37Km) 
2001 Sui Southern Gas Company LimitedWelding Inspection
&
Radiography Testing
Welding Inspection Services for four components of GIEP (Gas Infrastructure Rehabilitation & Expansion Project)
1999 Ghazi Barotha
Contractor
Welding Inspection
&
Radiography Testing
Services of NDT Inspector/Radiographer for Inspection of
Permanent Welds on Gates and Stoplogs Installation, Sill Beams
and Side Rails on the construction of Ghazi Barotha Hydropower
Project.
1999C.E (QC) – 1.a.2 (1813)Sui Northern Gas Pipeline LimitedWelding Inspection
&
Radiography Testing
Wedling Inspection for 16″ dia x 25 Miles between Kamra and Nowshera C9-C-10
199868-56-1997Pak-Arab Refinery LimitedUltrasonic InspectionInspection of full encirlement sleeve welidng on PARCO’s 16″ Dia Mainline from Karachi to Mahmoodkot, Gujrat
1998P/98/PL/8025Pak-Arab Refinery LimitedUltrasonic InspectionInspection of full encirlement sleeve welidng on PARCO’s 16″ Dia Mainline
1998C.E (QC) – 1.a.2 (1813)Sui Northern Gas Pipeline LimitedWelding Inspection
&
Radiography Testing
Wedling Inspection for 8″ dia x 15.44 Miles Daska-Pasrur Gas Pipline
1998C.E (QC) – 1.a.2 (1813)Sui Northern Gas Pipeline LimitedWelding Inspection
&
Radiography Testing
Wedling Inspection for 30″ dia x 21.25 Miles CV-CV25 Gas Pipeline
1998C.E (QC) – 1.a.2 (1813)Sui Northern Gas Pipeline LimitedWelding Inspection
&
Radiography Testing
Wedling Inspection for 30″ dia x 16 Miles A10-AV40 Gas Pipeline
1998 APECOWelding Inspection
&
Radiography Testing
Radiography on Docks & Cranes of PIA Wide-body Aircraft
maintenance Hanger, International Airport, Karachi.
1998P&D/W-INSP/SER-005ESui Southern Gas Company LimitedWelding Inspection
&
Radiography Testing
Welding Inspection Services against against Jacobabad-Damboli Loopine (Part-I) and Kolpur-Quetta Loopline (Part-II)
1997C.E (QC) – 1.a.2 (1813)Sui Northern Gas Pipelines LimitedWelding Inspection
&
Radiography Testing
Wedling Inspection for 8″ dia x 14.5 Miles Farooqabad Gas Pipeline
1997C.E (QC) – 1.a.2 (1813)Sui Northern Gas Pipelines LimitedWelding Inspection
&
Radiography Testing
Wedling Inspection for 30″ dia x 16 Miles Sui Down Stream Gas Pipeline
1996P&D/W-INSP/SER-005DSui Southern Gas Company LimitedWelding Inspection
&
Radiography Testing
Welding Inspection Services against the Sibi-Dhadar Loopline (Part-II)
1996 Pakistan Oilfields LimitedWelding Inspection
&
Radiography Testing
Wedling/Radiographic/Coat & Wrap Inspection on 8″ dia Gas Pipeline project.
1992CE (QC) – 1.a.2Sui Northern Gas Pipelines LimitedWelding Inspection
&
Radiography Testing
Welding Inspection & Radiography Services on high pressure Gas Pipeline Sections 
1993 Pakistan State Oil Company LimitedRaidographic TestingRadiographic Inspection of welding joints of 24″ dia x 12.5 Km long
cross country pipeline laid from Black Oil Terminal at Port Qasim to
Pipri Terminal.
1992 Royal Netherland EmbassyQ/A & QC ServicesQuality Control & Quality Assurance Services in Surgical Instruments
manufacturing for metal industries development project in Sialkot.
1992 Sui Southern Gas Company LimitedWelding Inspection
&
Radiography Testing
Welding Inspection 293 KM of 20″ dia Looplines on the Indus Right
Bank Capacity Pipeline System
1992 Sui Southern Gas Company LimitedWelding Inspection
&
Radiography Testing
Welding Inspection Services 10 KM Jamshoro-Kotri 18″ Pipeline 
1992 Sui Southern Gas Company LimitedWelding Inspection
&
Radiography Testing
Welding Inspection Services Badin Gas Field Integration Project
110 KM of 18″ dia pipeline from Badin Gas Fields to Hyderabad and
Kotri Barrage Crossing.
1991 Sui Southern Gas Company LimitedWelding Inspection
&
Radiography Testing
Welding Inspection Services of 10 KM Jamshoro-Kotri 18″ Pipeline  during June-1991 to November-1991
1990 Descon
Engineering
Works
Welding Inspection
&
Radiography Testing
Radiography of 1016 Nos. Boiler Tubes of 50.8 X 3.2 mm & 20 Nos. of 76.2 x 3.5 mm for Habib Suger Mills boiler.
1990 Sui Southern Gas Company LimitedWelding Inspection
&
Radiography Testing
Welding Inspection Services of 110 KM of 18″ dia pipeline from Badin
Gas Fields to Hyderabad and Kotri Barrage Crossings during
June 1987 to July-1990
1990 Descon Engineering WorksRadiogrphic InspectionRadiography of 1016 Nos. boiler tubes for Habib Suger Mills Boiler
1990 Marubani Power Development ProjectNDT InspectionNDT Inspection at KESC Thermal Power Station Extension Unit-5
     
1990PAK/TS/RKA/8807/KAR-2242LES EnterprisesRadiogrphic InspectionRadiograpy Tests at Gwadar Fish Harbour Project 
1989U-2-14National Refinery LimitedRadiogrphic InspectionRadiography on Kero Hydrobon Reactor 105 R1
1988DBK-WIC-L-2714Heavy Mechanical Complex LimitedRadiogrphic InspectionRadiographic Inspection Services at Bin Qasim Thermal Power Project
1988U-2-11National Refinery LimitedSpecialized Inspection Services for inspection and investigation of furnace tube bending
problem.
1988BPM-88Bengal Vegetable Industries Ltd.Ultrasonic InspectionUltrasonic Inspection of Equipments
1987CDN-I/218/F/85-86Govt. of Pakistan Ministry of Industries
Department of Supplies 
Pre-Shipment Inspection Pre-Shipment of Inspection of stores from USA, Canada, Japan,
Australia, Singapore, Hongkong, Republic South Korea, Philpines
and Newzeland.
1987ENG.M/PREQ/REGN.Pakistan Petroleum LimitedRaidographic TestingVisual and Radiographic inspection for construction of 16″ Northern
Gas Gathering Main Extension. (4,500 meters) at Sui Gas Field.
1987ENG.M/PREQ/REGN.Pakistan Petroleum LimitedNDT Inspection during
fabrication
Inspection during fabrication/welding of 18 Nos. liquid steel HP Gas
Traps fro installation on 2″ gas supply lines to Thermo-electric
generators at Sui Gas Field.
1987ENG.M/PREQ/REGN.Pakistan Petroleum LimitedWelding Inspection
 & Supervision of waterline 
Welding Inspection/supervision for construction of 20″ welded
waterline from MP-20 to Sui Gas Filed (25,000 meters)
1987PUL-C06-56450Pakistan Machine Tool Factory Ltd.Radiogrphic InspectionRadiographic Service on Base Plates of Mortars (Armament) 
1987D-1-2National Refinery LimitedRadiogrphic InspectionRadiographic Inspection of weldings at plant.
1986KSEW-023765Karachi Shipyard & Engineering Works Ltd. Maintenance works on several projects in petrochemical industries,
gas dehydration/purification plants, cement, suger plants and other
related installations.
1985CHE/bdJ.L. Offshore Drilling A/SRadiogrphic InspectionRadiographic Inspection on 6″ Square Kelly, 54″ overall length
1985 Sui Gas Transmission Company LimitedNon-destructive TestingNon-destructive testing and welding inspection work in respect of
Pirkoh Gas Field Integration Project comprised of laying of 18″ dia
70 Kilometer long high pressure pipeline from Pirkoh Gas Field to Sui
Purification Plant outlet headers and the installation of 2 Nos. gas
compressor units at delivery point at Sui.
1984 Chugoku X-ray Co., Ltd.Radiogrphic InspectionRadiographic Inspection for the Karachi Electric Supply Corp. Ltd.
Pakistan Pipri Thermal Power Station Unit-II
1984 Pakistan Machine Tool Factory Ltd.Radiogrphic InspectionRadiographic Test of welded seams diameter 630 and 227mm on
Base Plates of an indigenous product.
1983DGM(O)/119-182Sui Gas Transmission Company LimitedNon-destructive TestingSupervision and Radiographic inspection of pipelines welds on the
Malir-KT looping project.
1983 M. Aslam Khan & Co. Ltd.Radiogrphic InspectionRadiographic Inspection of welded joints on Patient Department
at Islamabad Hospital Complex
1982 Karachi Electric Supply Corporation Ltd.Non-destructive TestingWelding, NDT Test and other repair job on combustion liners of gas
turbines.
1982 Pakistan Steel  Andrex X-ray Machine operated at Oxygen Plant
1982 Marubani Power Development ProjectNon-destructive TestingNon-Destructive Testing/Welding Radiographic Services during erection of 200 MW Boiler at Thermal Power Station, Pipri, Unit-1, for K.E.S.C during the period March 1982 to November 1982
Inspection of Boiler Tubes, high pressure pipe-lines of different
diameter.
1982 Marubani Power Development ProjectNon-destructive TestingMagnetic Particle Testing on the Deaerator and Feedwater Tank
for Pipri Thermal Power Station
1981 Dominion Engineering Company LimitedNon-destructive TestingNon-destructive tests on the welds spiral cases at Warsak Dam
1981 Pak-Arab Refinery LimitedRadiographic
 &
Welding Inspection
Welding/Radiographic Inspection Services at PARCO Terminal Station
Keamari and Terminal Station Gujrat.
1981 M.S. Engineering Company Tested all cicumfrential welded seams of the boiler tube plate 
1981ST/81/8316Pak-Arab Refinery LimitedRadiographic InspectionWelding/Radiographic Inspection Services at PARCO Terminal Station
Keamari and Terminal Station Gujrat.
1981 National Refinery LimitedRadiographic InspectionRadiographic Inspection of weldings at Plant from time to time and
during shutdown.
1980 Peoples Enterprises Ltd.Non-destructive TestingX-Ray Radiography/Non-Destructive Testing Inspection on Docks &
Cranes of PIA Wide-body Aircraft maintenance Hanger, International
Airport, Karachi.
1980 Design Engineering Services & Construction Ltd.Non-destructive TestingProvided Welding Inspectors for construction jobs at the Attock
Refinery Ltd., Rawalpindi on 5,000 and 20,000 BPSD refinery projects
1980 Marubani Power Development ProjectRadiogrphic InspectionX-Ray Radiography Inspection of Compressor Cross Head, High Steam
pressure piping of welded joints at stie Thermal Power Station and Thermal Power Station Korangi.
1979 Water & Power Development AuthorityNon-destructive TestingNon-destructive Testing during annual shutdown to detect H.P & L.P
rotors and their diaphragms cracks-Magnaflux Testing-Ultrasonic
Testing carried out of turbine casing, bolts and boiler drum nipples.
1978 Dawood Hercules Chemical LimitedNon-destructive TestingNon-destructive Testing during annual shutdown 
1978 Pakistan Navy Dockyard LaboratoryLaboratory EquipmentAndrex X-ray Machine operated at Laboratory
1977 Bechtel International, Inc.Welders QualificationWedlers Qualification Test, Pipe and Sheet 
1977 Wester Pipleidingen b.vRadiographic InspectionRadiographic Services 
1976 Hitachi Radiographic InspectionRadiographic Inspection of high steam pressure piping
of welded joints at Thermal Power Station Korangi.
1976 Attock Oil Company LimitedRadiographic InspectionRadiographaic Inspection of 20″ Long Vessel
1975-1976 Pakistan Petroleum LimitedRadiographic
 &
Welding Inspection
Radiographic/Welding Inspection of welding jobs on steel pipelines
and pipe fittings designed for 2000 psi gas working pressure at Sui
Gas Field of Pakistan Petroleum Limited.
1974-1975 Sui Northern Gas Pipeline LimitedWelding InspectionWelding Inspection Services on construction of 16″ & 18″ diameter
high pressure gas transmission pipe lines